Product Center

Tel (Mr. Liu)

+86-13969686279 

E-mail (Mr. Liu)

liufush@qdset.com

Tel (Mr. Huang)

+86-15253216678
E-mail (Mr. Huang)

huangys@qdset.com

+
  • 9新疆准东电厂1#机刚性梁安装施工现场.jpg

Construction Site for the Installation of the Rigid Beam of Unit 1 at the Jun Dong Power Plant in Xinjiang


It mainly produces biomass power generation boilers, waste incineration power generation boilers, thermal power plant boiler steel structure, denitrification steel structure and boiler auxiliary equipment, environmental protection equipment, casting equipment and other products.
Classification:

Keyword:

Construction Site for the Installation of the Rigid Beam of Unit 1 at the Jun Dong Power Plant in Xinjiang

  • Details

More products

Boiler Steel Structure Series

Hi

Please leave the information you want to inquire about, and we will contact you as soon as possible.